 |
 |
|
 |
|
 |
|
|
|
Don Matthys' Enterprise B/Excelsior part 2 |
 |
 |
|
Don Matthys continues his latest project, builting the USS Excelsior and the USS Enterprise-B simultaniously. Part one of this project involved drillingout the ports and filling with clear resin. Be sure to check out of his previous projects have included the Enterprise A and the Reliant. Don also markets a resin detail parts.
The AMT kit of the
USS Excelsior has detail design errors on the Primary Hull these are at the locations of the Maneuvering Thruster arrays and along the indented rings around the edge of the Primary Hull. It should not be indented but as on the same level as the rest of the kit plastic. Check the web site of Pete Savin's (Pedro's Shiporama) for the true nature of the studio model. So I went ahead filled them in like this:
|
 |
 |
|
The new pieces are glued into place. Then a plastic piece was cut to size and glued to the top of the Truster Cluster array.
|
 |
 |
|
This next section deals with the spotlights on the lower hull. On the bottom of the Primary Hull is the kit molded on part of the
Planetary Sensor Array. I fabricated some tiny clear pieces to fit into the ends of the Array
|
|
|